Project Details
Work Type: Bridge Construction
Phase: Design
Length: 0.011 miles
City:
County:
Start of Current Phase: Late 2025
Letting: 07/31/2026
Estimated Costs
Construction Cost: $1.7 million
About

The Florida Department of Transportation (FDOT), District One, is proposing to replace the bridge on Homestead Avenue over Marsh Creek (Bridge No. 074026). The existing bridge culvert consists of five, 68-inch diameter, 48-foot-long corrugated metal pipes which will be removed.  The proposed replacement is a 60-foot-long bridge using a two-span cast-in-place flat slab. It will consist of two 11-foot lanes, two 2-foot shoulders, and concrete traffic railings. 

Public Involvement

Public Meeting on December 11, 2025, at Pioneer Park Community Center, 910 Panama Avenue, Clewiston, FL 33440.

View Factsheet
Contact Information
Design Project Manager
Jeffrey M. Jones, P.E., Project Manager
239-2251920
JeffreyM.Jones@dot.state.fl.us
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Project Documents