Project Details
| Work Type: | Interchange Construction |
|---|---|
| Phase: | Construction |
| Limits: | I-75 at SR 951 (Collier Boulevard) Interchange and Collier Boulevard from Business Circle South to City Gate Drive. |
| Length: | 1.3 miles |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $97 million |
| Start of Current Phase: | Early 2023 |
| Est. Completion of Current Phase: | Mid 2026 |
About
FDOT is currently designing improvements to Interstate 75 (I-75) at the SR 951 (Collier Boulevard) interchange in Collier County. The proposed improvements for the I-75 at SR 951 (Collier Boulevard) interchange include reconstruction of the I-75 southbound on- and off-ramp connections and the northbound on-ramp connection to the mainline lanes. The southbound and northbound off-ramps will be reconstructed to create additional infield space to install single-lane, 200-foot radius loop ramps in the southwest and northeast quadrants.
The northeast quadrant loop ramp will be connected to, and accessible only by, a direct flyover ramp from northbound Collier Boulevard with a starting point south of the Davis Boulevard intersection. This single-lane flyover ramp will carry traffic over Beck Boulevard and a reconstructed I-75 southbound on-ramp.
A single-lane flyover ramp extension will carry I-75 southbound traffic over Davis Boulevard to a new signalized intersection at Collier Boulevard and Business Circle North. This ramp will extend along the western side of Collier Boulevard.
Public Involvement
Thank you for attending the Pre-Construction Information Session on Tuesday, March 7, 2023 at the New Hope Event Center in Naples, Florida.
To view meeting materials, please click on the documents listed below under Public Involvement.
TO SIGN UP FOR CONSTRUCTION ALERTS
click here to receive text or email alerts
Contact Information
| Communications Team |
|---|
|
Jennifer Dorning
239-338-7723
Jennifer.Dorning@dot.state.fl.us
|
| Construction Project Manager |
|
Alex Ruiz
(941) 708-4419
Alex.Ruiz@dot.state.fl.us
|
| For Media Inquiries Only |
|
fdot-d1comm@dot.state.fl.us
|
RoadWatch
-
I-75 at S.R. 951 (exit 101) Interchange Improvements: FDOT is reconstructing the I-75 southbound on- and off-ramp connections and the northbound on-ramp connection to the mainline lanes at S.R. 951 (exit 101). The northeast quadrant loop ramp will be connected to, and accessible only by, a direct flyover ramp from northbound Collier Boulevard starting south of the Davis Boulevard intersection. This single-lane flyover ramp will carry traffic over Beck Boulevard and a reconstructed I-75 southbound on-ramp. A single-lane flyover ramp extension will carry I-75 southbound traffic over Davis Boulevard to a new signalized intersection at Collier Boulevard and Business Circle North. This ramp will extend along the western side of Collier Boulevard.
The following activities are subject to change based on weather conditions and unforeseen underground conditions.
During the nighttime/overnight hours on Tuesday, December 9 and Wednesday, December 10, motorists should expect S.R. 84/Davis Boulevard closed at S.R./C.R. 951/Collier Boulevard for crews to install beams for the elevated roadway, weather permitting. Motorists may use Business Circle North or Business Circle South and Market Street instead of the S.R. 84/Davis intersection. Detour signs will be posted.
Motorists should expect intermittent lane closures for southbound and northbound C.R. 951/Collier Boulevard during nighttime/overnight hours for crews to install temporary barrier wall, move equipment, deliver materials, and construct the overhead bridge work.
Motorists should expect lane shifts on S.R./C.R.951/Collier Boulevard from Business Circle South to I-75 to create work zones for crews to construct the elevated roadway.
Motorists should expect the outside right turn lane from southbound S.R. 951 to westbound S.R. 84/Davis Boulevard closed. Drivers can continue to turn right from the remaining open turn lane. This closure is needed for crews to begin work for the bridge foundation installation and will remain in place through job completion.
Pedestrians should expect a sidewalk closure along S.R. 84 (Davis Boulevard) just west of S.R. 951 (Collier Boulevard) and along S.R. 951 (Collier Boulevard) between S.R. 84 (Davis Boulevard) and Business Circle North. Pedestrians may use S.R. 84 (Davis Boulevard) to Market Street to Business Circle South to access S.R. 951 (Collier Boulevard).
Motorists are advised that the S.R. 84 (Davis Boulevard) eastbound direct access ramp heading south to S.R. 951 (Collier Boulevard) is permanently closed. The eastbound to southbound right turn will be available at the intersection.
Motorists should expect reduced lane widths for southbound Collier Boulevard between Business Circle North and Business Circle South.
Please use caution and watch for workers and construction vehicles entering and leaving the roadway. The expected completion date is end of 2026. For more information please visit: https://www.swflroads.com/project/425843-2.
-
I-75 at S.R. 951 (exit 101) Interchange Improvements: FDOT is reconstructing the I-75 southbound on- and off-ramp connections and the northbound on-ramp connection to the mainline lanes at S.R. 951 (exit 101). The northeast quadrant loop ramp will be connected to, and accessible only by, a direct flyover ramp from northbound Collier Boulevard starting south of the Davis Boulevard intersection. This single-lane flyover ramp will carry traffic over Beck Boulevard and a reconstructed I-75 southbound on-ramp. A single-lane flyover ramp extension will carry I-75 southbound traffic over Davis Boulevard to a new signalized intersection at Collier Boulevard and Business Circle North. This ramp will extend along the western side of Collier Boulevard.
The following activities are subject to change based on weather conditions and unforeseen underground conditions.
· Over the next two weeks, MOTORISTS SHOULD EXPECT DELAYS as crews will be setting the beams for the elevated roadway over the S.R. 84/Davis Boulevard/Beck Boulevard intersection. Work is scheduled during nighttime/overnight hours. Traffic will often use Business Circle S. and Market Street as a detour. Detours are listed below as scheduled. Law enforcement will be onsite to assist motorists. PLEASE AVOID THE AREA IF POSSIBLE:
o Sunday, December 7 - S.R. 84/Davis Boulevard will be closed at S.R./C.R. 951/Collier Boulevard. Motorists may use Business Circle North or Business Circle South and Market Street instead of the S.R. 84/Davis intersection. Additionally, Beck Boulevard to southbound C.R. 951/Collier Boulevard will be closed. Motorists will need to turn right and make a U-turn to access southbound C.R.951/Collier Boulevard.
o Tuesday, December 9 –S.R. 84/Davis Boulevard will be closed from Market Street to C.R. 951/Collier Boulevard. Additionally, 2 lanes of southbound C.R.951/Collier Boulevard will be closed between S.R. 84/Davis Boulevard and Business Circle N. Motorists can use Market Street and Business Circle N to travel.
o Thursday, December 11 - Northbound C.R. 951/Collier Boulevard will be closed from Business Circle S. to Beck Boulevard. Motorists must turn left on Business Circle south to Market Street to S.R. 84/Davis Boulevard to continue on northbound C.R.951/Collier Boulevard.
· Motorists should expect intermittent lane closures for southbound and northbound C.R. 951/Collier Boulevard during nighttime/overnight hours for crews to install temporary barrier wall, move equipment, deliver materials, and construct the overhead bridge work.
· Motorists should expect lane shifts on S.R./C.R.951/Collier Boulevard from Business Circle South to I-75 to create work zones for crews to construct the elevated roadway.
· Motorists should expect the outside right turn lane from southbound S.R. 951 to westbound S.R. 84/Davis Boulevard closed. Drivers can continue to turn right from the remaining open turn lane. This closure is needed for crews to begin work for the bridge foundation installation and will remain in place through job completion.
· Pedestrians should expect a sidewalk closure along S.R. 84 (Davis Boulevard) just west of S.R. 951 (Collier Boulevard) and along S.R. 951 (Collier Boulevard) between S.R. 84 (Davis Boulevard) and Business Circle North. Pedestrians may use S.R. 84 (Davis Boulevard) to Market Street to Business Circle South to access S.R. 951 (Collier Boulevard).
· Motorists are advised that the S.R. 84 (Davis Boulevard) eastbound direct access ramp heading south to S.R. 951 (Collier Boulevard) is permanently closed. The eastbound to southbound right turn will be available at the intersection.
· Motorists should expect reduced lane widths for southbound Collier Boulevard between Business Circle North and Business Circle South.
Please use caution and watch for workers and construction vehicles entering and leaving the roadway. The expected completion date is end of 2026. For more information please visit: https://www.swflroads.com/project/425843-2.